Description:
Recontstruction project
Hull modification:
- constructed completely new bulbous bow
- installed new 750 kW bow thruster
- replaced existing rectangular type bilge strake with new curved type bilge strake on total vessel's length on both sides
Cable laying equipment modification:
- new roller chute
- new steel framework construction with hydraulically powered and operated wire rope sheave device
- new inner ring in cable carousel
- new pick-up arm
Total new built-in steel 350 tons
Produced all classification and workshop technical documentation
Main particulars:
Loa before reconstruction: 128.54 m
Loa after reconstruction: 135.00 m
Breadth: 30.54 m
Displacement: 16,891 t
Deadweight: 7,000 tons of cable